An Otto 6 Field Guide

One Project, Not One Deadline

Why the pilot should be sized to the job, not the calendar.

A project executive is three weeks into a ninety day pilot. The team is still importing drawings. Half the subs aren't set up. The first real test, a change order moving through the system under pressure, hasn't happened yet.

Day ninety arrives anyway. The pilot ends, and nobody has learned whether the system works on a real job, because the job outlasted the pilot.

This field guide makes the case for sizing a pilot to the project instead of the calendar, and lays out what that changes about how the work, and the pricing, actually get scoped.

What's inside

  • The clock that runs out before the job does
  • A command center that starts empty too
  • One job, six disconnected systems
  • What you're already paying to run one project
  • Why the ninety day pilot never proves anything
  • From systems of record to systems of action
  • Project Genius
  • What Project Genius does
  • It does not arrive empty
  • Your GC still gets what your GC mandates
  • Priced to the project, not guessed at
  • One project today. The platform, when you're ready.

Get the field guide — free, with an instant download.