When does a construction project actually start?

Bassem Hamdy · CEO, briq · November 17, 2026

A construction project starts at the first signal, not at award. Here is how AI changes project initiation for contractors.

A construction project starts the moment an owner or general contractor gives the first sign that the job exists. That is well before award. Bassem Hamdy argues that contractors set up fee erosion before they even bid, because the work of finding, judging, and pricing opportunities is scattered and mostly untracked.

How does project initiation work at most contractors today?

An invitation to bid or a phone call comes in. A group meets for a go/no-go, and the answer is usually go, because people are paid to bring in work. Estimating gets the job on top of everything else it is pricing. Someone builds a proposal, often in Word, sends it, and then nobody follows up until the client calls. When the job is won, the team scrambles to open a job number and set the project up in several systems. Meanwhile the CFO asks for a pipeline report and gets a spreadsheet that does not reflect what is really being bid.

What are the three ways opportunities come in?

Bassem describes three channels:

  • Inbound. Emails, invitations to bid, and conversations with clients.
  • Regional signals. City council minutes, zoning and change-of-use filings, land and lease activity. A tenant improvement contractor wants to know the moment a space is leased.
  • Account-based signals. Large owners announce their plans. Public companies and government agencies describe what they will build in earnings calls and required filings. In Bassem's words, your target client is telling you its construction plans.

How does AI change project initiation?

Otto watches all three channels around the clock. It scores each opportunity against a profile of your company that it builds from your past projects, wins and losses, claims, and safety record. Anything scored four stars or higher triggers deeper research: it downloads drawings and specs, looks at the owner's history, checks whether you have worked with them before, and looks for a relationship in. A business developer starts the day with a short list of opportunities worth a look instead of 300 emails.

Does AI make the go/no-go decision?

No. People still decide. Bassem's point is that they decide with the facts in front of them. If you want to bid a poor project, you still can, but you go in knowing it.

Why does this matter for the rest of the project?

Ellis Talton sums it up: project initiation is a process, not a task. When the opportunity is tracked from the first signal, the estimate, the budget, and the cash flow forecast all start from accurate information instead of a spreadsheet rebuilt by hand after award.

Frequently asked questions

What is a construction signal?

Any early indication that a project is coming, such as a public filing, a zoning change, a lease, or an owner's announced expansion plans.

How does AI decide which bids are worth pursuing?

Otto scores each opportunity against what it knows about your company's history and strengths, then researches the strongest ones in depth.

Why do construction pipeline reports tend to be inaccurate?

Because opportunities live in inboxes and spreadsheets, and nobody consistently tracks what was bid, won, or lost.

Watch the full conversation in Episode 3 of Future of Work: Rewired.